{"id":1490,"date":"2025-11-20T13:10:04","date_gmt":"2025-11-20T19:10:04","guid":{"rendered":"https:\/\/www.k-g.com.mx\/?p=1490"},"modified":"2025-12-17T16:24:57","modified_gmt":"2025-12-17T22:24:57","slug":"nuevo-reglamento-de-la-ley-de-planeacion-y-transicion-energetica","status":"publish","type":"post","link":"https:\/\/www.k-g.com.mx\/en\/nuevo-reglamento-de-la-ley-de-planeacion-y-transicion-energetica\/","title":{"rendered":"NEW REGULATIONS TO THE ENERGY PLANNING AND TRANSITION LAW"},"content":{"rendered":"<p>On October 3, 2025, the new regulations governing Mexico\u2019s energy sector, covering hydrocarbons, electricity, biofuels and energy transition matters were published in the Diario Oficial de la Federaci\u00f3n (Official Gazette of the Federation, \u201cDOF\u201d), among them, the new Reglamento de la Ley de Planeaci\u00f3n y Transici\u00f3n Energ\u00e9tica (Regulations of the Energy Planning and Transition Law (\u201cRegulations\u201d).<\/p>\n\n\n\n<p>The publication is available here: <a href=\"https:\/\/www.dof.gob.mx\/nota_detalle.php?codigo=5769157&amp;fecha=03\/10\/2025#gsc.tab=0\" target=\"_blank\" rel=\"noreferrer noopener\">Reglamento de la Ley de Planeaci\u00f3n y Transici\u00f3n Energ\u00e9tica (Regulations of the Energy Planning and Transition Law)<\/a><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Under the new Regulations, the creation of the National Energy Transition Strategy is established as a medium- and long-term planning instrument for the energy sector.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The Regulation specifically governs binding planning for the energy sector, which is oriented toward the development of strategic areas and projects that ensure, among other objectives, Energy Justice , as well as the regulation of energy transition obligations. Binding planning must be taken into account by SENER and the Comisi\u00f3n Nacional de Energ\u00eda (National Energy Commission; \u201cCNE\u201d) when granting assignments, contracts, permits, concessions, and authorizations.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The National Energy Information System will be created to consolidate, record, organize, update, and disseminate all sectoral information to support SENER in exercising binding planning. The system will publish public information and document repositories on an internet platform.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The National Energy Information System must begin operations no later than 180 business days from October 6, 2025, that is June 22, 2026.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>SENER will likewise have until June 22, 2026 to issue the obligations and requirements for acquiring clean energy certificates applicable for compliance during 2026\u20132028.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The following regulations are repealed:<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-table is-style-regular\"><table><tbody><tr><td><strong>Repealed<\/strong><\/td><td><strong>Replaced By<\/strong><\/td><\/tr><tr><td>Reglamento de la Ley de Transici\u00f3n Energ\u00e9tica (Regulations of the Energy Transition Law).\n(DOF 4\/05\/2017)<\/td><td>Reglamento de la Ley de Planeaci\u00f3n y Transici\u00f3n Energ\u00e9tica (Regulations of the Energy Planning and Transition Law)<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p>I. <strong>Content of the Regulations<\/strong><\/p>\n\n\n\n<p>I.1. <strong>General Matters.<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Regulatory authority is granted to SENER, the Comisi\u00f3n Nacional para el Uso Eficiente de la Energ\u00eda (National Commission for the Efficient Use of Energy; \u201cCONUEE\u201d), the Centro Nacional de Control de Energ\u00eda (National Energy Control Center; \u201cCENACE\u201d), and the Centro Nacional de Control del Gas Natural (National Natural Gas Control Center \u201cCENAGAS\u201d).<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The Regulation governs the organization and operation of the Energy Planning Council, which will be composed of SENER, CONUEE, CENACE, CENAGAS, CNE, Petr\u00f3leos Mexicanos (\u201cPEMEX\u201d), the Comisi\u00f3n Federal de Electricidad (Federal Electricity Commission; \u201cCFE\u201d), and LitioMX. The Council will issue opinions on binding planning and on the publication or updating of planning instruments for the energy sector.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The National Energy Information System will be created to consolidate, record, organize, update, and disseminate all sectoral information to support SENER in exercising binding planning. The system will publish public information and document repositories on an internet platform.<br><\/li>\n\n\n\n<li>Inspection, oversight, and enforcement powers are also granted to CONUEE.<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n\n\n\n<p>I.2. <strong>Binding Planning and Social Considerations.<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The Regulation develops the components of binding planning for the energy sector, which will be issued by SENER through general administrative provisions and is oriented toward the development of strategic areas and projects that ensure, among other objectives: (i) the predominance of CFE, (ii) the promotion of decarbonization, and (iii) adherence to the principle of Energy Justice.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Binding planning will be implemented through: (A) the general administrative provisions issued by SENER, and (B) the \u201cPlanning Instruments\u201d, consisting of: (i) the National Energy Transition Strategy; (ii) the Sectoral Energy Program (\u201cPROSENER\u201d); (iii) the Energy Transition and Sustainable Energy Use Plan (\u201cPLATEASE\u201d); (iv) the Electric Sector Development Plan (\u201cPLADESE\u201d); and (v) the Hydrocarbons Sector Development Plan (\u201cPLADESHi\u201d).<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The National Energy Transition Strategy, prepared by SENER, will set 15-year and 30-year objectives for renewable-energy transition, sustainable use, energy efficiency, clean energy, Energy Justice, innovation, and technological development.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>PROSENER is defined as the short-term master planning instrument intended to give effect to the objectives of the National Development Plans.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>PLATEASE will establish planning goals for renewable energy, clean energy, energy efficiency, sustainable use, reduction of energy poverty, and the development of biofuels.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>PLADESE will include the regulatory framework for the electric sector, a diagnostic with at least 15 years of historical data, medium-term scenarios, and the investment programs and plans of PEMEX, CFE, and LitioMX.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>PLADESHi will replicate the structure of PLADESE for the hydrocarbons sector, also incorporating CENAGAS\u2019s project portfolio and identifying capacity and infrastructure requirements that must be developed through private investment.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Binding planning must be considered by SENER and the CNE when granting assignments, contracts, permits, concessions, and authorizations.<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n\n\n\n<p>I.3. <strong>Programaci\u00f3n de la planeaci\u00f3n vinculante.<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>In the electric sector, the PLADESE process begins annually in the year preceding its applicability, when CENACE and CFE submit their binding programs for the installation and retirement of power plants and their expansion and modernization programs for the national transmission grid and the general distribution networks, with a 15-year horizon. These programs will be reviewed and, where appropriate, approved and published as the PLADESE, while the Energy Planning Council oversees implementation.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>In the hydrocarbons sector, the PLADESHi will also follow an annual cycle led by SENER, without specifying the months in which each stage must occur. CENAGAS, PEMEX, and independent system operators will participate by submitting their five-year expansion plans. The CNE will issue a technical opinion on the draft, and the Energy Planning Council will issue observations before SENER approves and publishes the PLADESHi.<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n\n\n\n<p>II. <strong>Transitional Regime.<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The National Energy Information System must begin operations no later than 180 business days after October 6, 2025, that is, by June 22, 2026.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>SENER will likewise have until June 22, 2026 to issue the obligations and requirements for acquiring clean energy certificates applicable for compliance during 2026\u20132028.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>As a one-time measure, the processes for preparing the Planning Instruments will not be required to follow the procedural steps set out in the Regulation.<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n\n\n\n<p>If you have any questions regarding the scope or implementation of this note, please contact us.<\/p>\n\n\n\n<p><strong>Bernardo Mendoza<\/strong><br>Partner<br><a href=\"mailto:bmendoza@k-g.com\" target=\"_blank\" rel=\"noreferrer noopener\">bmendoza@k-g.com<\/a><\/p>\n\n\n\n<p><strong>Dorothy Lerch<\/strong><br>Counselor<br><a href=\"mailto:dlerch@k-g.com.mx\" target=\"_blank\" rel=\"noreferrer noopener\">dlerch@k-g.com.mx<\/a><\/p>\n\n\n\n<p><strong>Gerardo H. Estrada<\/strong><br>Attorney<br><a href=\"mailto:gestrada@k-g.com.mx\">gestrada@k-g.com.mx<\/a><\/p>\n\n\n\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>El 3 de octubre de 2025 se publicaron en el Diario Oficial de la Federaci\u00f3n (\u201cDOF\u201d) los reglamentos que actualizan el marco jur\u00eddico del sector energ\u00e9tico en M\u00e9xico, abarcando hidrocarburos, electricidad, biocombustibles y transici\u00f3n energ\u00e9tica, entre ellos el Reglamento de la Ley de Planeaci\u00f3n y Transici\u00f3n Energ\u00e9tica. La publicaci\u00f3n se puede consultar aqu\u00ed: Reglamento de [&hellip;]<\/p>","protected":false},"author":1,"featured_media":1491,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1490","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sin-categoria"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.3.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>NUEVO REGLAMENTO DE LA LEY DE PLANEACI\u00d3N Y TRANSICI\u00d3N ENERG\u00c9TICA - KAVANAGH | GOROZPE<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.k-g.com.mx\/en\/nuevo-reglamento-de-la-ley-de-planeacion-y-transicion-energetica\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"NUEVO REGLAMENTO DE LA LEY DE PLANEACI\u00d3N Y TRANSICI\u00d3N ENERG\u00c9TICA - KAVANAGH | GOROZPE\" \/>\n<meta property=\"og:description\" content=\"El 3 de octubre de 2025 se publicaron en el Diario Oficial de la Federaci\u00f3n (\u201cDOF\u201d) los reglamentos que actualizan el marco jur\u00eddico del sector energ\u00e9tico en M\u00e9xico, abarcando hidrocarburos, electricidad, biocombustibles y transici\u00f3n energ\u00e9tica, entre ellos el Reglamento de la Ley de Planeaci\u00f3n y Transici\u00f3n Energ\u00e9tica. La publicaci\u00f3n se puede consultar aqu\u00ed: Reglamento de [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.k-g.com.mx\/en\/nuevo-reglamento-de-la-ley-de-planeacion-y-transicion-energetica\/\" \/>\n<meta property=\"og:site_name\" content=\"KAVANAGH | GOROZPE\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/KavanaghGorozpe\/\" \/>\n<meta property=\"article:published_time\" content=\"2025-11-20T19:10:04+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-12-17T22:24:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.k-g.com.mx\/wp-content\/uploads\/2025\/11\/Foto-ARRENDAMIENTO-100-4.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1731\" \/>\n\t<meta property=\"og:image:height\" content=\"1149\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Dev_Upwyse\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Dev_Upwyse\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.k-g.com.mx\/nuevo-reglamento-de-la-ley-de-planeacion-y-transicion-energetica\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.k-g.com.mx\/nuevo-reglamento-de-la-ley-de-planeacion-y-transicion-energetica\/\"},\"author\":{\"name\":\"Dev_Upwyse\",\"@id\":\"https:\/\/www.k-g.com.mx\/#\/schema\/person\/4bed2e498768bb8d745ddc50ae0902d3\"},\"headline\":\"NUEVO REGLAMENTO DE LA LEY DE PLANEACI\u00d3N Y TRANSICI\u00d3N ENERG\u00c9TICA\",\"datePublished\":\"2025-11-20T19:10:04+00:00\",\"dateModified\":\"2025-12-17T22:24:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.k-g.com.mx\/nuevo-reglamento-de-la-ley-de-planeacion-y-transicion-energetica\/\"},\"wordCount\":1235,\"publisher\":{\"@id\":\"https:\/\/www.k-g.com.mx\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.k-g.com.mx\/nuevo-reglamento-de-la-ley-de-planeacion-y-transicion-energetica\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.k-g.com.mx\/wp-content\/uploads\/2025\/11\/Foto-ARRENDAMIENTO-100-4.jpg\",\"articleSection\":[\"Sin categor\u00eda\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.k-g.com.mx\/nuevo-reglamento-de-la-ley-de-planeacion-y-transicion-energetica\/\",\"url\":\"https:\/\/www.k-g.com.mx\/nuevo-reglamento-de-la-ley-de-planeacion-y-transicion-energetica\/\",\"name\":\"NUEVO REGLAMENTO DE LA LEY DE PLANEACI\u00d3N Y TRANSICI\u00d3N ENERG\u00c9TICA - KAVANAGH | GOROZPE\",\"isPartOf\":{\"@id\":\"https:\/\/www.k-g.com.mx\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.k-g.com.mx\/nuevo-reglamento-de-la-ley-de-planeacion-y-transicion-energetica\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.k-g.com.mx\/nuevo-reglamento-de-la-ley-de-planeacion-y-transicion-energetica\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.k-g.com.mx\/wp-content\/uploads\/2025\/11\/Foto-ARRENDAMIENTO-100-4.jpg\",\"datePublished\":\"2025-11-20T19:10:04+00:00\",\"dateModified\":\"2025-12-17T22:24:57+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.k-g.com.mx\/nuevo-reglamento-de-la-ley-de-planeacion-y-transicion-energetica\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.k-g.com.mx\/nuevo-reglamento-de-la-ley-de-planeacion-y-transicion-energetica\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.k-g.com.mx\/nuevo-reglamento-de-la-ley-de-planeacion-y-transicion-energetica\/#primaryimage\",\"url\":\"https:\/\/www.k-g.com.mx\/wp-content\/uploads\/2025\/11\/Foto-ARRENDAMIENTO-100-4.jpg\",\"contentUrl\":\"https:\/\/www.k-g.com.mx\/wp-content\/uploads\/2025\/11\/Foto-ARRENDAMIENTO-100-4.jpg\",\"width\":1731,\"height\":1149},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.k-g.com.mx\/nuevo-reglamento-de-la-ley-de-planeacion-y-transicion-energetica\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Inicio\",\"item\":\"https:\/\/www.k-g.com.mx\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"NUEVO REGLAMENTO DE LA LEY DE PLANEACI\u00d3N Y TRANSICI\u00d3N ENERG\u00c9TICA\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.k-g.com.mx\/#website\",\"url\":\"https:\/\/www.k-g.com.mx\/\",\"name\":\"KAVANAGH | GOROZPE\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/www.k-g.com.mx\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.k-g.com.mx\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.k-g.com.mx\/#organization\",\"name\":\"Kavanagh Gorozpe\",\"url\":\"https:\/\/www.k-g.com.mx\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.k-g.com.mx\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.k-g.com.mx\/wp-content\/uploads\/2023\/08\/Grupo-2.svg\",\"contentUrl\":\"https:\/\/www.k-g.com.mx\/wp-content\/uploads\/2023\/08\/Grupo-2.svg\",\"width\":345.626,\"height\":105.755,\"caption\":\"Kavanagh Gorozpe\"},\"image\":{\"@id\":\"https:\/\/www.k-g.com.mx\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/KavanaghGorozpe\/\",\"https:\/\/www.linkedin.com\/company\/kavanagh-gorozpe\/\",\"https:\/\/www.instagram.com\/kavanagh.gorozpe\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.k-g.com.mx\/#\/schema\/person\/4bed2e498768bb8d745ddc50ae0902d3\",\"name\":\"Dev_Upwyse\",\"sameAs\":[\"https:\/\/upwyse.co\/kg\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"NUEVO REGLAMENTO DE LA LEY DE PLANEACI\u00d3N Y TRANSICI\u00d3N ENERG\u00c9TICA - KAVANAGH | GOROZPE","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.k-g.com.mx\/en\/nuevo-reglamento-de-la-ley-de-planeacion-y-transicion-energetica\/","og_locale":"en_US","og_type":"article","og_title":"NUEVO REGLAMENTO DE LA LEY DE PLANEACI\u00d3N Y TRANSICI\u00d3N ENERG\u00c9TICA - KAVANAGH | GOROZPE","og_description":"El 3 de octubre de 2025 se publicaron en el Diario Oficial de la Federaci\u00f3n (\u201cDOF\u201d) los reglamentos que actualizan el marco jur\u00eddico del sector energ\u00e9tico en M\u00e9xico, abarcando hidrocarburos, electricidad, biocombustibles y transici\u00f3n energ\u00e9tica, entre ellos el Reglamento de la Ley de Planeaci\u00f3n y Transici\u00f3n Energ\u00e9tica. La publicaci\u00f3n se puede consultar aqu\u00ed: Reglamento de [&hellip;]","og_url":"https:\/\/www.k-g.com.mx\/en\/nuevo-reglamento-de-la-ley-de-planeacion-y-transicion-energetica\/","og_site_name":"KAVANAGH | GOROZPE","article_publisher":"https:\/\/www.facebook.com\/KavanaghGorozpe\/","article_published_time":"2025-11-20T19:10:04+00:00","article_modified_time":"2025-12-17T22:24:57+00:00","og_image":[{"width":1731,"height":1149,"url":"https:\/\/www.k-g.com.mx\/wp-content\/uploads\/2025\/11\/Foto-ARRENDAMIENTO-100-4.jpg","type":"image\/jpeg"}],"author":"Dev_Upwyse","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Dev_Upwyse","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.k-g.com.mx\/nuevo-reglamento-de-la-ley-de-planeacion-y-transicion-energetica\/#article","isPartOf":{"@id":"https:\/\/www.k-g.com.mx\/nuevo-reglamento-de-la-ley-de-planeacion-y-transicion-energetica\/"},"author":{"name":"Dev_Upwyse","@id":"https:\/\/www.k-g.com.mx\/#\/schema\/person\/4bed2e498768bb8d745ddc50ae0902d3"},"headline":"NUEVO REGLAMENTO DE LA LEY DE PLANEACI\u00d3N Y TRANSICI\u00d3N ENERG\u00c9TICA","datePublished":"2025-11-20T19:10:04+00:00","dateModified":"2025-12-17T22:24:57+00:00","mainEntityOfPage":{"@id":"https:\/\/www.k-g.com.mx\/nuevo-reglamento-de-la-ley-de-planeacion-y-transicion-energetica\/"},"wordCount":1235,"publisher":{"@id":"https:\/\/www.k-g.com.mx\/#organization"},"image":{"@id":"https:\/\/www.k-g.com.mx\/nuevo-reglamento-de-la-ley-de-planeacion-y-transicion-energetica\/#primaryimage"},"thumbnailUrl":"https:\/\/www.k-g.com.mx\/wp-content\/uploads\/2025\/11\/Foto-ARRENDAMIENTO-100-4.jpg","articleSection":["Sin categor\u00eda"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.k-g.com.mx\/nuevo-reglamento-de-la-ley-de-planeacion-y-transicion-energetica\/","url":"https:\/\/www.k-g.com.mx\/nuevo-reglamento-de-la-ley-de-planeacion-y-transicion-energetica\/","name":"NUEVO REGLAMENTO DE LA LEY DE PLANEACI\u00d3N Y TRANSICI\u00d3N ENERG\u00c9TICA - KAVANAGH | GOROZPE","isPartOf":{"@id":"https:\/\/www.k-g.com.mx\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.k-g.com.mx\/nuevo-reglamento-de-la-ley-de-planeacion-y-transicion-energetica\/#primaryimage"},"image":{"@id":"https:\/\/www.k-g.com.mx\/nuevo-reglamento-de-la-ley-de-planeacion-y-transicion-energetica\/#primaryimage"},"thumbnailUrl":"https:\/\/www.k-g.com.mx\/wp-content\/uploads\/2025\/11\/Foto-ARRENDAMIENTO-100-4.jpg","datePublished":"2025-11-20T19:10:04+00:00","dateModified":"2025-12-17T22:24:57+00:00","breadcrumb":{"@id":"https:\/\/www.k-g.com.mx\/nuevo-reglamento-de-la-ley-de-planeacion-y-transicion-energetica\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.k-g.com.mx\/nuevo-reglamento-de-la-ley-de-planeacion-y-transicion-energetica\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.k-g.com.mx\/nuevo-reglamento-de-la-ley-de-planeacion-y-transicion-energetica\/#primaryimage","url":"https:\/\/www.k-g.com.mx\/wp-content\/uploads\/2025\/11\/Foto-ARRENDAMIENTO-100-4.jpg","contentUrl":"https:\/\/www.k-g.com.mx\/wp-content\/uploads\/2025\/11\/Foto-ARRENDAMIENTO-100-4.jpg","width":1731,"height":1149},{"@type":"BreadcrumbList","@id":"https:\/\/www.k-g.com.mx\/nuevo-reglamento-de-la-ley-de-planeacion-y-transicion-energetica\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Inicio","item":"https:\/\/www.k-g.com.mx\/"},{"@type":"ListItem","position":2,"name":"NUEVO REGLAMENTO DE LA LEY DE PLANEACI\u00d3N Y TRANSICI\u00d3N ENERG\u00c9TICA"}]},{"@type":"WebSite","@id":"https:\/\/www.k-g.com.mx\/#website","url":"https:\/\/www.k-g.com.mx\/","name":"KAVANAGH | GOROZPE","description":"","publisher":{"@id":"https:\/\/www.k-g.com.mx\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.k-g.com.mx\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.k-g.com.mx\/#organization","name":"Kavanagh Gorozpe","url":"https:\/\/www.k-g.com.mx\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.k-g.com.mx\/#\/schema\/logo\/image\/","url":"https:\/\/www.k-g.com.mx\/wp-content\/uploads\/2023\/08\/Grupo-2.svg","contentUrl":"https:\/\/www.k-g.com.mx\/wp-content\/uploads\/2023\/08\/Grupo-2.svg","width":345.626,"height":105.755,"caption":"Kavanagh Gorozpe"},"image":{"@id":"https:\/\/www.k-g.com.mx\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/KavanaghGorozpe\/","https:\/\/www.linkedin.com\/company\/kavanagh-gorozpe\/","https:\/\/www.instagram.com\/kavanagh.gorozpe\/"]},{"@type":"Person","@id":"https:\/\/www.k-g.com.mx\/#\/schema\/person\/4bed2e498768bb8d745ddc50ae0902d3","name":"Dev_Upwyse","sameAs":["https:\/\/upwyse.co\/kg"]}]}},"_links":{"self":[{"href":"https:\/\/www.k-g.com.mx\/en\/wp-json\/wp\/v2\/posts\/1490","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.k-g.com.mx\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.k-g.com.mx\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.k-g.com.mx\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.k-g.com.mx\/en\/wp-json\/wp\/v2\/comments?post=1490"}],"version-history":[{"count":6,"href":"https:\/\/www.k-g.com.mx\/en\/wp-json\/wp\/v2\/posts\/1490\/revisions"}],"predecessor-version":[{"id":1554,"href":"https:\/\/www.k-g.com.mx\/en\/wp-json\/wp\/v2\/posts\/1490\/revisions\/1554"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.k-g.com.mx\/en\/wp-json\/wp\/v2\/media\/1491"}],"wp:attachment":[{"href":"https:\/\/www.k-g.com.mx\/en\/wp-json\/wp\/v2\/media?parent=1490"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.k-g.com.mx\/en\/wp-json\/wp\/v2\/categories?post=1490"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.k-g.com.mx\/en\/wp-json\/wp\/v2\/tags?post=1490"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}